In Kyiv, DTEK Grids has connected its first industrial size solar plant atop an apartment building.

Tuesday, November 17, 2020
In Kyiv, DTEK Grids has connected its first industrial size solar plant atop an apartment building.

In Kyiv, DTEK Grids has connected its first industrial size solar plant atop an apartment building. Built by the Avrora Term Company the array atop a building in Troieshchyna has 1,200 solar panels and output of 330kW. Ivan Geliukh, DTEK Grids CEO, says that this year the company is connecting 75 industrial solar power plants for a total capacity of 566 MW.

Support independent journalism team

Dear Ukraine Business News reader, we are a team of 20 Ukrainian journalists, researchers, reporters and editors who would humbly ask for your support.

Previous post
At present, patients occupy about 60% of the 52,000 beds in the nation’s coronavirus wards.

At present, patients occupy about 60% of the 52,000 beds in the nation’s coronavirus wards.

Next post
With the third departure in six weeks, the purge of pro-Western reformers from Ukraine’s defense industry continued with Monday’s abrupt firing of Volodomyr Usov, the head of Ukraine’s Space Agency

With the third departure in six weeks, the purge of pro-Western reformers from Ukraine’s defense industry continued with Monday’s abrupt firing of Volodomyr Usov, the head of Ukraine’s Space Agency

Previous Main Topics