Construction is to start this fall on Europe’s second-largest onshore wind farm, located on the Zaporizhia coast of the Sea of Azov. London-based VLC Renewables has reached financial close with LongWing Energy S.C.A. to build the first 98 MW phase of a 500 MW wind farm.

Tuesday, August 13, 2019
Construction is to start this fall on Europe’s second-largest onshore wind farm, located on the Zaporizhia coast of the Sea of Azov. London-based VLC Renewables has reached financial close with LongWing Energy S.C.A. to build the first 98 MW phase of a 500 MW wind farm.

Construction is to start this fall on Europe’s second-largest onshore wind farm, located on the Zaporizhia coast of the Sea of Azov. London-based VLC Renewables has reached financial close with LongWing Energy S.C.A. to build the first 98 MW phase of a 500 MW wind farm. If fully built as designed a decade ago, the EuroCape project will be second only in Europe to the 600 MW Fântânele-Cogealac wind farm in Romania.

Support independent journalism team

Dear Ukraine Business News reader, we are a team of 20 Ukrainian journalists, researchers, reporters and editors who would humbly ask for your support.

Previous post
Kyiv hotel occupancies dropped by one percentage point during the first half of last, to 48%

Kyiv hotel occupancies dropped by one percentage point during the first half of last, to 48%

Next post
Private locomotives should be allowed to pull private freight trains down public tracks,

Private locomotives should be allowed to pull private freight trains down public tracks,

Previous Main Topics