Site icon UBN

The UBC Group is building a second line of refrigeration equipment production in Vinnytsia.

The UBC Group is building a second line of refrigeration equipment production in Vinnytsia.

Chiller rooms, large industrial refrigeration rooms, including motor and water pipes

The plant’s area will be 5,000 square meters, and construction is planned to be completed in 2024.

In addition, the company put into operation a 600 kW solar power plant at the Green Cool facility. In total, 1,080 solar panels have been installed at the enterprise. It is noted that the panels will ensure stable electrical supply for the plant and will also be able to minimize the load on the country’s power grid. The company wants to replace 100% of its electricity consumption with energy produced by RES during the period from April to September.

Green Cool, which operates out of the Vinnytsia Cluster of Refrigeration Engineering industrial park, makes refrigeration equipment that is exported to more than 20 countries.

Exit mobile version