Language:
Українська
Русский
Français
Español
Türkçe

The first caravan of 2 barges and 1 tug passed through the newly build Dnipro lock.

It is planned to implement a series of such locks to improve Dnipro River logistics. This type of lock allows ships to save up to 8 hours in one pass. The saved time will allow the shipowner to make up to 10 trips a year and to transport up to 100 thousand tons per navigation. This is another step towards the development of water logistics, which should become a convenient alternative to road and rail transportation, said the Minister of Infrastructure, Oleksandr Kubrakov. Next year, the draft budget will provide funding for such projects up to UAH 600 million ($22.5 mln)

Post navigation
Previous post

Interpipe will invest $1 mln to increase the production of pipes for mechanical engineering.

Next post

The program "Affordable loans 5-7-9%" will continue into 2022.