” said Arup Banerji, World Bank Regional Director. “The project also helps Ukraine align with the European Green Deal.” With an installed capacity of 5.7 gigawatts, Ukrhydroenergo operates eight hydroelectric power plants on the Dnipro and two on the Dnister.