On January 9, a ship tagged as the seventh ship delivered 75.5 thousand tons of American coal in the port of Yuzhnyi. Tomorrow, the 11th, the eighth ship with 82.5 thousand tons of fuel will be moored as well. The company is expecting the arrival of the ninth ship with some imported coals later this month. In total, it amounts to 215 thousand tons for the needs of Ukrainian thermal power plants. In total, DTEK contracted 9 ship deliveries. This is about 618 thousand tons of coal for the needs of Ukrainian thermal power plants.